In recent years, with the continuous development and growth of the Chinese furniture industry market, more and more clients from overseas countries have chosen to purchase custom furniture in China. In order to help clients save logistics costs, many custom furniture makers will prefer to separate the packaging so as to save the loading space. Therefore, many custom villa furniture are installed at the site of the customer's project. Since the structure and connection method of the custom furniture itself are relatively standardized, the installer only needs to carry out a certain period of training to master the installation method. Generally speaking, in order to ensure that the structural size of the furniture does not cause problems, the more complicated furniture will be tested in the furniture factory after the production is completed, and after the fitting is correct, it will be disassembled and then packaged. When installing on site, the installer only needs to refer to the design drawings to complete the installation. Below we have prepared the on-site installation workflow for custom villa furniture. It can be used as a reference for clients who are currently preparing villa furniture installations. 8 Steps to The Installation of Custom Villa Furniture1.Packaging inspection. Check the integrity of the package and check the accessories according to the packing list. 2.Operation area cleaning. First, clean the floor and wall surface where the custom cabinet will be installed to prevent it from cleaning and affecting the stability of the custom cabinet. Second, plan a work area in the client's house that is convenient for the next assembly operation. When installed, the packaging material can be tiled to the floor to protect the furniture surface and protect the customer's floor. 3. Cabinets, drawers and other components assembling. During the assembly process of the villa furniture, it is necessary to pay attention to the structural drawings and assemble them according to the specified order. 4. Custom cabinet installation. When installing the cabinet, it is necessary to re-measure the dimensions of the customer's room to ensure that the cabinet can be installed in place. If there are problems such as uneven ground height and wall gap, the cabinet size needs to be adjusted. 5.Functional accessories installation. Install the assembled functional components onto the custom cabinet and try to debug them. 6.Junction point processing. The structure of the cabinet is completed. We need to process the junction between the custom cabinet and the wall, column, ceiling, etc., fill the gap and cover it with the same color cover. 7.Installation acceptance. Check the stability of the body structure of the custom cabinet to ensure a tight connection. Check the availability of moving parts and functional components to ensure stable and reliable functions. 8.Furniture and floor cleaning. Clean up the debris generated during the installation process, dust on the furniture and clean up the processing marks. Check the tools and accessories for any omissions. AboutInteri Furniture is a leading Chinese brand of high-end home and contract furniture. We specialize in providing professional custom furniture production services for star hotels, high-end apartments, royal clubs, luxury villas, etc. If you have a custom need for home furniture,villa furniture or other project, please feel free to contact us. We will meet all your needs with the best quality and the fast delivery time.
0 Comments
Your comment will be posted after it is approved.
Leave a Reply. |
TAGS
All
Archives
May 2024
|